2000
March 2002
Sold all shares of Yokogawa Mentec Co., Ltd. to Yokogawa Construction Co., Ltd.
Kurushima Kaikyo-ohashi Bridge
Ehime
Kurushima Kaikyo-ohashi Bridge
The Kurushima Kaikyo Bridge is the bridge located on the Imabari side of the Onomichi-Imabari route (commonly known as the Setouchi Shimanami Kaido), which connects Honshu and Shikoku. Kurushima Kaikyo Bridge is the collective name for the three Suspension bridges spanning the Kurushima Strait, approximately 4 km between Imabari City and Oshima, and is the world's first triple Suspension bridge. The main cables consisted of 3 strands for the First Bridge, 3 strands for the Second Bridge and the Third Bridge, and the total weight of the three cables was approximately 44 tons. In the stiffening girder construction work for the Third Bridge, we adopted the direct suspension method from the sea, which is advantageous in terms of the cross-sectional characteristics of the box girder and the construction process.
Tatara-ohashi Bridge
Hiroshima prefecture/Ehime prefecture
Tatara-ohashi Bridge
This bridge is a cable-stayed bridge with a center span of 890m located exactly at the midpoint of the Honshu-Shikoku Connecting Bridge's Onomichi-Imabari route (commonly known as the Setouchi Shimanami Kaido). Erection was carried out using balancing construction, large block construction for the side spans, and cantilever construction for the center span. The large block in the side span was erected using a 102-ton floating crane with a length of 1,600 meters and a weight of 3,500 tons. In addition, the main girder block for the center span was constructed using a 350t traveler crane suspended above the existing girder, and was suspended directly from a barge moored at a fixed point at sea.
Yamanashi Prefectural Government Building Main Building
Yamanashi Prefecture
Yamanashi Prefectural Government Building Main Building
This was Japan's first seismic isolation renovation work for a prefectural government building, and the work was carried out while the building was still in use. The structure of the building consists of 4 rows of four columns, and the load was controlled using jacks for each of the four columns in each row, and the seismic isolation was replaced with a seismic isolation device. The load was controlled (maximum 10t) using compact lock jacks Cap.1t (4 units/200 column, 4 columns per row). After that, the existing pillars were cut and seismic isolation devices (approximately 1 tons) were inserted and installed.
Imabeppugawa Bridge
Kagoshima
Imabeppugawa Bridge
In this project, the cantilever construction method of a two-frame continuous girder rigid-frame bridge proposed to the Japan Highway Public Corporation at the time as a construction method for high pier bridges in mountainous areas was applied as a model bridge for the Higashi Kyushu Expressway. be. The bridge is a three-span continuous non-synthetic composite rigid-frame bridge with a length of 2m and a width of 188.5m, consisting of steel girders and concrete piers, and was constructed using the cantilever construction method using a traveling erection gantry crane. After completing the erection of the main girder, the same crane used the same crane to sequentially lay the precast deck slabs.
Yokohama Port International Passenger Terminal
Kanagawa
Yokohama Port International Passenger Terminal
The Yokohama Port International Passenger Terminal is a structure made entirely of steel plates, with core box beams placed on the left and right, connected by large folded plates. The three-dimensionally bent deformed box beams were cut into rings and then joined together on site. The joint is an all-welded structure. The steel parts were manufactured in South Korea, and the products were transported by sea and erected using a 3-ton crawler crane.
Saitama Stadium
Saitama
Saitama Stadium
In addition to constructing the steel frame, we also participated in the SRC site PC conversion and step-floor PC construction, and the entire structure was completed by our company. In this project, we boldly took on new challenges, such as changing the deck slab to a two-tiered type and using the large block construction method to erect the system truss for the roof steel frame. As a result of this construction, our company became involved in construction PC.
Tokyo Racecourse
Tokyo
Tokyo Racecourse
In this project, a large cable-suspended roof with an area of approximately 40 square meters extending 5,000 meters from the steel frame was constructed so as not to interfere with horse racing. Two 2t lifting crawler cranes were used for erection. The 450m double garter suspended from 32 masts at the top of the structure was divided into three parts and supported by two rows of vents, and the most advanced part was erected using the cantilever method. The cable was strung across the entire roof into two blocks and taut twice. A 40t jack was used for the front cable, and a 3t jack was used for the pack cable.
March 2005
Izumi factory begins operation in Izumi City, Osaka Prefecture.
August 2007
Holding company Yokogawa Bridge Holdings Co., Ltd. established
October 2007
Became a wholly owned subsidiary of Yokogawa Bridge Holdings Co., Ltd. and was delisted.
Head office moved to 27 Yamano-cho, Funabashi City, Chiba Prefecture.
Head office moved to 27 Yamano-cho, Funabashi City, Chiba Prefecture.
November 2007
100th anniversary ceremony held
Higashi Honganji Temple
Kyoto
Higashi Honganji Temple
This work was carried out as a special commemorative project for the 2011th anniversary of the death of the founder of the sect, Shinran, in 79, and was a temporary bare roof construction project for the restoration of Mieido, which is the world's largest wooden building in terms of area. A bare roof is a temporary roof structure that covers the entire building, and is usually constructed using a wooden roof frame, but Mieido's bare roof is a very large-scale steel frame structure measuring 92 m in width, 51 m in length, and XNUMX m in maximum height. Planned. Due to the site conditions, construction was carried out by assembling on the north gantry and connecting the plain roof steel frame by sequentially sliding the structure.
Oigawa Bridge
Shizuoka Prefecture
Oigawa Bridge
It is a large bridge with a maximum span length of 127 meters and a steel weight of 1, spanning the Oigawa River, a difficult point on the Tokaido that was famously sung as ``Hakone Hachiri can be crossed by horses, but the Oigawa River cannot be crossed.'' The bridge type is a 1,180-span steel continuous composite variable section box Girder bridge, and the deck is a cast-in-place PC deck slab using movable formwork. For welding the horizontal joints of girders, we use large windshield equipment similar to those found in factories, an inverted hand rolling machine that can handle the delivery of girders with variable cross-sections, a hinged delivery device, and deflection control for the hand rolling machine that can be up to 6 m long. Many innovations were made in the construction of the erection slabs.
Minato-ohashi Bridge
Osaka
Minato-ohashi Bridge
The Minato Bridge, completed in 1974, is a Gelbert truss bridge with a length of 980 m. In this construction work, the floor structure was seismically isolated as part of seismic reinforcement work. The main work involved replacing 306 BP bearings on the existing steel deck with 282 sliding plate shoes and 24 rubber spring shoes, which has the effect of reducing the energy that acts on the main structure truss from the steel deck during an earthquake. This is an improvement to the structure. Along with this improvement, we added rubber spring shoes that are effective for restoring the bridge during large movements, a continuous floor structure for movement restriction devices in the direction perpendicular to the bridge axis, and a bridge collapse prevention device structure in the direction of the bridge axis.
Shimoueno viaduct
Osaka
Shimoueno viaduct
The bridge is located between Kyoto Minami IC and Ibaraki IC on the Meishin Expressway, and National Route 171, one of the main arteries connecting Kyoto and Osaka, runs under the elevated overpass. A feature of the reinforcement work is that the main girders of the pier cross beams were integrated into a four-span simple Girder bridge supported on three steel cross beams that span National Route 171, a heavy traffic route, while ensuring traffic on the national highway. The structure was changed to a four-span continuous three-dimensional rigid-frame bridge. This was a major project that could be said to be the culmination of our company's urban expressway repair and reinforcement technology, and was highly rated by the customer.
Fuda no Tsuji Bridge
Tokyo
Fuda no Tsuji Bridge
Fuda no Tsuji Bridge, located in Minato Ward, Tokyo, is a key transportation hub connecting the city center and the waterfront, spanning 10 railway lines, including the Tokaido Shinkansen Tokaido Main Line, Japan's main artery. Approximately 1933 years have passed since it opened in 60, and the bridge had deteriorated significantly, so it was decided that it would be replaced. The construction work was carried out in four phases: 1 temporary bridge construction, 2 existing bridge removal, 3 new bridge construction, and 4 temporary bridge removal. In particular, the third phase of construction, in which the existing bridge with a weight adjustment of 4 yen was removed overnight using the construction girder method, symbolized our company's advanced technological capabilities.
Nakamaruko I Block Twin Towers
Kanagawa
Nakamaruko I Block Twin Towers
In recent years, precast (PCa) construction methods have been widely adopted in high-rise condominiums. The PCa construction method is a construction method in which concrete members are manufactured in advance at a factory and then assembled on site, rather than the traditional method of assembling and pouring a framework on site. This PCa construction method was also adopted for the new construction of the Nakamaruko I block twin towers. In this project, we worked hard in both production and construction to achieve a 1-day cycle for each floor, with each floor being constructed in 4 days, and we were able to achieve our goal.
Taiwan Expressway C606A section viaduct
Taiwan
Taiwan Expressway C606A section viaduct
National Highway No. 6 is a newly constructed 28km national highway that connects the central part of Taiwan from east to west, and our company constructed the superstructure of the viaduct in Section C606A, which is part of it. The bridge is a seven-span continuous steel deck curved box Girder bridge with a length of 838.5m and a width of 26.85m to 35.44m, and a large-scale bridge with a steel weight of 7t. In addition, it is a high pier with a height of over 1m, and has a structural feature in that each pier is supported by anchors, except for the end supports. Since most of the construction sites are located within rivers, most of the main girders were erected using the bulk lifting method during the dry season.
Shinjuku Kosen Bridge
Tokyo
Shinjuku Kosen Bridge
Shinjuku Kosen Bridge is located on National Route 20, adjacent to the south exit of Shinjuku Station, one of the largest terminals in Japan. As part of the infrastructure development project for the south exit of Shinjuku Station, this construction project involves replacing the Shinjuku Railway Bridge, which was built in 1925, with a new bridge with an effective width of 50m (currently 30m). The biggest challenge was to construct the line without compromising its function as a metropolitan artery and ensuring safe transportation as a station. The rebuilding was carried out in two stages: 1st phase construction (9 main girders in the widening section, width 25m) and 2nd phase construction (9 main girders in the replacement section, width 25m).
Ozekiyama Overpass Bridge
Hiroshima
Ozekiyama Overpass Bridge
This work involves converting an RC railway viaduct into a PC bridge. The construction conditions were to ensure traffic on the prefectural road under the girder and the operation of commercial lines, as well as shorten the amount of time railway service would be suspended by replacing the bridge. Therefore, intensive construction work (live line switching) was adopted, in which the PC bridge that had been manufactured on site was taken over and erected. In girder manufacturing, we tackled the issue of simultaneously pouring concrete for the main girder and the floor, both of which have a high girder height.
Girder erection supports 1,064t bridge body
Girder erection supports 1,064t bridge body
2010
December 2010
ISO14001 certification registration
Rainbow Bridge (Tokyo Port Bridge)
Tokyo
Rainbow Bridge (Tokyo Port Bridge)
Rainbow Bridge is a 11-span, 570-hinged stiffened truss Suspension bridge with a central span of 114 m, side spans of 798 m, and a total length of 3 m, located on the section of the Metropolitan Expressway No. 2 Daiba Line that crosses Tokyo Port. In the earthquake-resistance improvement work, the tower and stiffening girders were reinforced against collision loads, and cushioning rubber was installed. In addition, horizontal ribs were installed at the base of the side towers to prevent deformation due to local buckling, in areas where deformation is large. Additionally, measures were taken to improve earthquake resistance, such as reinforcing the main tower top horizontal members and wind tongue system.
Kadoma viaduct west
Osaka
Kadoma viaduct west
This project is a large-scale construction project involving an automobile-only road near Kadoma IC on the Daini Keihan Road, three bridge piers on a 1km section of the up and down line of a general road, and 3 elevated bridges, each weighing more than 11 steel. Due to transportation constraints, the steel-concrete composite structure of the pier is divided into two sections, so the members were assembled into a box shape on site and then erected using a 1-ton truck crane. Regarding the connection between the RC column and the upper part of the steel column, a steel column member was erected on top of the RC column, and after the erection was completed, the post-casting part of the RC column and the column member were filled with concrete.
stonecutters bridge
Hong Kong
stonecutters bridge
The bridge connects Stonecutters Island, known as Hong Kong's largest container district, with Tsing Yi Island, and is the world's largest bridge with a total length of 1,596m, a central span of 1,018m, a width of 533m, and a main tower height of 298m. It is a class composite cable-stayed bridge. For the steel girders in the side spans, a heavy lift construction method was adopted in which super-heavy steel girders were fabricated above ground and then hoisted up using strand jacks. The total length of the steel girder was 88m, and the two main girders had a total weight of 2t, making it one of the largest bulk lifts in Asia. The steel girder in the center span was constructed using direct suspension.
Katsushika Harp Bridge
Tokyo
Katsushika Harp Bridge
This bridge is a 455-span continuous steel deck box girder cable-stayed bridge with a length of 4 m spanning the Metropolitan Expressway Central Loop Line. The superstructure girders are supported by 48 cables fanned out from parent and child towers of different heights. In this construction work, internal reinforcing members with horizontal and vertical ribs will be installed on the steel piers and main tower, displacement limiting devices, bridge collapse prevention devices, and step prevention devices will be installed at the bridge ends, and RC piers supporting the main tower will be installed. We implemented seismic reinforcement measures such as installing uplift measures, shaft yield type dampers, and displacement limiting devices.
Takashima Hizen-ohashi Bridge
Nagasaki prefecture/Saga prefecture
Takashima Hizen-ohashi Bridge
The bridge is part of a 12 km long remote island bridge spanning the Hibi Channel that runs between Karatsu City, Saga Prefecture and Matsuura City, Nagasaki Prefecture, and is a 840-span continuous composite cable-stayed bridge with a length of 5 m. In this construction, the side spans were erected in large blocks using diagonal bents and floating cranes, and the center span was erected with an overhang using the fabricated erection nose.
[Completion year] 2009
[Construction name] Takashima Hizen Bridge construction work
[Type of work] Steel bridge construction
[Construction overview] 4,194t
[Construction method] Side span: Large block construction/overhang construction by hanging directly below the center span
[Completion year] 2009
[Construction name] Takashima Hizen Bridge construction work
[Type of work] Steel bridge construction
[Construction overview] 4,194t
[Construction method] Side span: Large block construction/overhang construction by hanging directly below the center span
Matsubara railway bridge
Fukuoka
Matsubara railway bridge
The main bridge is a construction project to construct landing gear and main girders for the Kyushu Shinkansen over the JR Kagoshima Main Line in Kurume City, Fukuoka Prefecture. The substructure was constructed using 16 steel gate-shaped rigid frame legs using the rotary erection method. During the daytime work, we erected the pillars of the gate-shaped Ramen legs in advance, assembled the crossbeams parallel to the railroad tracks on one pillar with a rotation device installed, and rotated the pillars during the main line outage hours. This is a construction method that integrates the pillar with the other pillar. The superstructure was divided into two sections, consisting of six 1243-span and 3-span continuous steel box Girder bridges and one simple steel box Girder bridge with a total length of 4 m, and was erected using the send-out method.
[Completion year] 2009
[Construction Name] Kyushu Shinkansen Matsubara Bi New Construction Work
[Type of work] Steel bridge construction
[Construction overview] Steel legs: 2,350t/steel girder 7,326t
[Construction method] Steel legs: Rotating erection method/Steel girder sending method
[Completion year] 2009
[Construction Name] Kyushu Shinkansen Matsubara Bi New Construction Work
[Type of work] Steel bridge construction
[Construction overview] Steel legs: 2,350t/steel girder 7,326t
[Construction method] Steel legs: Rotating erection method/Steel girder sending method
October 2015
Merged with Yokogawa Construction Co., Ltd.
Miyuki-ohashi Bridge
Nara
Miyuki-ohashi Bridge
Girders have been reinforced and joints have been regularly repaired since 1992, but the deterioration and damage to the floor slabs became noticeable, so it was decided to replace them with precast PC floor slabs. . During construction, the building was replaced with precast PC deck slabs twice a day, and temporary steel deck slabs were used as lining plates, allowing the building to be opened to traffic during the day.
[Completion year] 2010
[Construction name] Nishi-Meihan Expressway Miyuki Bridge (inbound line) floor slab reinforcement work (1st phase)
[Type of work] Repair/reinforcement
[Construction Overview] Floor slab replacement: 401㎡/15 precast PC floor slabs
[Construction method] Floor board replacement
[Completion year] 2010
[Construction name] Nishi-Meihan Expressway Miyuki Bridge (inbound line) floor slab reinforcement work (1st phase)
[Type of work] Repair/reinforcement
[Construction Overview] Floor slab replacement: 401㎡/15 precast PC floor slabs
[Construction method] Floor board replacement
Ibi Nagara-ohashi Bridge
Mie prefecture/Aichi prefecture
Ibi Nagara-ohashi Bridge
The Ibi-Nagara Bridge, completed in 1963, is a 23-section truss bridge with a length of 1,032 meters that spans the border between Mie and Aichi prefectures along National Route 14. During an inspection in 2007, numerous defects due to corrosion were discovered, so it was decided to carry out reinforcement work on the main structure and floor. The main structure was reinforced with backing plates for the top chord and diagonal members. Regarding the floor structure, boat-shaped reinforcement was implemented at the intersections of the longitudinal and transverse girders to improve durability against fatigue. The area around the bearing was jacked up, the sole plate was replaced, and the backing plate was reinforced.
[Completion year] 2010
[Construction name] Ibi Nagara Bridge reinforcement work
[Type of work] Repair/reinforcement
[Construction overview] Girder reinforcement: 316t
[Construction method] Girder reinforcement
[Completion year] 2010
[Construction name] Ibi Nagara Bridge reinforcement work
[Type of work] Repair/reinforcement
[Construction overview] Girder reinforcement: 316t
[Construction method] Girder reinforcement
Osaka Station
Osaka
Osaka Station
Our company constructed the steel frame work for the station building on the bridge, the north-south structure, the east-west structure, and the dome roof. For the bridge station building, the steel frame assembled on the ground is sent to the sky above the platform using an endless sliding device and double twin jacks.The east and west frames are constructed using the traveler crane construction method.The north and south frames and dome roof are constructed using double twin jacks, using the steel frames assembled on the upper part of the bridge station building. A slide construction method was used in which the construction was carried out horizontally. It was a site where we could fully demonstrate our bridge construction technology.
[Completion year] 2011
[Construction name] Osaka Station improvement and other construction works
[Type of work] Special construction [Construction overview] Steel 10,250t
[Construction method] Sending method Traveler crane method Slide method
[Completion year] 2011
[Construction name] Osaka Station improvement and other construction works
[Type of work] Special construction [Construction overview] Steel 10,250t
[Construction method] Sending method Traveler crane method Slide method
Asao Bridge
Toyama
Asao Bridge
This project is a three-span continuous synthetic steel box girder construction project located between Shin-Kurobe Station and Toyama Station on the Hokuriku Shinkansen over the Hokuriku Expressway. The steel girder is a single box structure with a width of 3 m and a height of 6.3 m.Due to transportation constraints, it was divided into four parts (the fulcrum part was divided into six parts) and delivered to the site, and all joints of the girder were welded on site. Ta. This bridge intersects with the Hokuriku Expressway at a shallow angle of 4.6 degrees, so the span of the center span is long at 1m.As a result, the girder has a large cross section as mentioned above, and is the largest railway bridge in Japan in terms of both the sending span and the steel weight. It was a high-class construction project.
[Completion year] 2011
[Construction Name] Asao Bridge Ryo Erection Slab Work
[Type of work] Steel bridge construction
[Construction overview] 1589t
[Construction method] Center span delivery method/side span: Truck crane pent method
[Completion year] 2011
[Construction Name] Asao Bridge Ryo Erection Slab Work
[Type of work] Steel bridge construction
[Construction overview] 1589t
[Construction method] Center span delivery method/side span: Truck crane pent method
June
2019
2019
Kishiwada factory opened in Kishiwada City, Osaka Prefecture.
Otemachi One
Tokyo
Otemachi One
This project involved the construction of two large, multi-purpose skyscrapers, including a multipurpose hall, hotel, commercial facilities, and offices, in a prime location in Tokyo facing the Imperial Palace. The adjacent buildings were constructed at the same time, and the steel weight exceeded 2 tons, making this an unprecedentedly large-scale project. We fully utilized our expertise in steel frame construction for skyscrapers to successfully complete the project.
[Client] Kajima Construction
[Steel weight (t)] 65,000t
[Type of Construction] Super high-rise
[Client] Kajima Construction
[Steel weight (t)] 65,000t
[Type of Construction] Super high-rise
New National Stadium
Tokyo
New National Stadium
This project is a construction project for the National Stadium, which will be the main stadium for the Tokyo 2020 Olympic and Paralympic Games. The construction was highly challenging, with a large cantilevered roof structure of approximately 60m, the largest among Japanese stadiums, but we were able to fully utilize our technical capabilities in large space structures and successfully complete the project. As a mecca for Japanese sports, this stadium will continue to be loved by people all over the world.
[Client] Taisei Corporation
[Steel weight (t)] 13,000t
[Type of work] Vent
[Client] Taisei Corporation
[Steel weight (t)] 13,000t
[Type of work] Vent
2020
2020Years
Kesennuma Bay Crossing Bridge Kawaguchi Area
Miyagi
Kesennuma Bay Crossing Bridge Kawaguchi Area
This bridge spanning Kesennuma Bay is affectionately known as "Kanae Ohashi" after the bay's other name, "Kanaegaura," and is a crossing bridge that serves as a symbol of the recovery from the Great East Japan Earthquake. Of the Kesennuma Bay Crossing Bridge, which is 1,344m long (a 3-span continuous steel cable-stayed bridge, a 7-span continuous steel box Girder bridge, and a 3-span continuous steel box Girder bridge), this project involved the construction of the land section, which is 473.5m long (7-span continuous steel box Girder bridge) that crosses the second-class river Okawa. The launch of the two spans of the river crossing was carried out on high piers over 2m high, and the entire length of 30m was erected in four stages, making it a large-scale construction.
[Completion year] 2020
[Project name] National Route 45 Kesennuma Bay Crossing Bridge Kawaguchi Area Superstructure Project
[Type of work] Steel bridge production/erecting
[Steel weight] 2,871t
[Construction method] Throwing method, truck crane venting method
[Completion year] 2020
[Project name] National Route 45 Kesennuma Bay Crossing Bridge Kawaguchi Area Superstructure Project
[Type of work] Steel bridge production/erecting
[Steel weight] 2,871t
[Construction method] Throwing method, truck crane venting method
2021Years
Freedom Bridge
南 ス ー ダ ダ
Freedom Bridge
This bridge was built over the Nile River in the outskirts of the capital, Juba, and was a grant aid project by the Japanese government (JICA). The construction of the four main Langer Bridges was shortened by adopting a construction method in which the bridge was assembled on the ground on a temporary pier and then pier-mounted on the bridge pier. Due to the effects of the civil war and the COVID-4 pandemic, the construction period was extended from the initial three and a half years to nine years, but the president and vice president, who had been in conflict, attended the completion ceremony, and the bridge was named "Freedom Bridge" as a symbol of peace and freedom in South Sudan.
[Completion year] 2021
[Project name] Nile River Bridge (Freedom Bridge)
[Length of bridge] 560m (150+350+60m)
[Construction overview] 5-span continuous plate girder + 4-span continuous plate girder + 2-span continuous plate girder
[Completion year] 2021
[Project name] Nile River Bridge (Freedom Bridge)
[Length of bridge] 560m (150+350+60m)
[Construction overview] 5-span continuous plate girder + 4-span continuous plate girder + 2-span continuous plate girder
Kudan Kaikan Terrace
Tokyo
Kudan Kaikan Terrace
This project involved preserving part of the long-loved Kudan Kaikan, built in 1934, through seismic retrofitting, and rebuilding the building that was damaged in the Great East Japan Earthquake. We were in charge of the seismic retrofitting work for the preserved portion, and the steel frame work for the new construction portion. We contributed to both preserving the value of the building and creating new value, and this was a project that allowed us to fully demonstrate our technical capabilities.
[Client] Kajima Construction
[Steel weight (t)] 9,673t
[Type of Work] Ultra-high rise, seismic isolation retrofit, renovation
[Client] Kajima Construction
[Steel weight (t)] 9,673t
[Type of Work] Ultra-high rise, seismic isolation retrofit, renovation
2022Years
Modhumoti Bridge
Bangladesh
Modhumoti Bridge
The bridge was built over the Modhumoti River, a tributary of the Ganges River that crosses Bangladesh from north to south, and is a loan aid project by the Japanese government (JICA). It is the first Nielsen-Lohse bridge in the country to be built using the Nielsen-Lohse method. The bridge was erected using a crane barge using the bent method, and New-PWS was used for the hanger cables. The year 2022, when it opens, marks the 50th anniversary of the establishment of diplomatic relations between Japan and Bangladesh, and this bridge, which utilized Japanese technology, is positioned as a symbol of friendship between the two countries.
[Completion year] 2022
[Project name] Modhumoti Bridge
[Bridge length] 150m (main span)
[Construction Overview] Nielsen-Lohse Arch Bridge
[Completion year] 2022
[Project name] Modhumoti Bridge
[Bridge length] 150m (main span)
[Construction Overview] Nielsen-Lohse Arch Bridge
Shibuya Sakura Stage
Tokyo
Shibuya Sakura Stage
This property was built in the heart of Shibuya, adjacent to the Shuto Expressway Shibuya Line and JR lines, and under difficult construction conditions, we took charge of the steel frame construction, making use of our experience in high-rise buildings. The SAKURA Tower, which we built, is one of the largest office buildings in the Shibuya area, with 39 floors above ground and 4 floors below ground, and features a large commercial area on the lower floors. It has become a prominent presence in the ever-evolving Shibuya area.
[Client] Kajima Construction
[Steel weight (t)] 26,125t
[Type of Construction] Super high-rise
[Client] Kajima Construction
[Steel weight (t)] 26,125t
[Type of Construction] Super high-rise
Misato Nagareyama Bridge
Saitama Prefecture and Chiba Prefecture
Misato Nagareyama Bridge
This bridge is located at the Edogawa River crossing of the Misato Nagareyama Toll Road, which connects Misato City, Saitama Prefecture and Nagareyama City, Chiba Prefecture. The bridge is 445m long and is a seven-span continuous steel narrow box Girder bridge with a cast-in-place PC deck. Of the seven spans, four on land were erected using the crawler crane bent method, and the three spans across the river were erected using the launching method. As there was not enough yard space to assemble the launching girders at the front and back of the bridge, the launching was carried out in two stages (first stage: 7m, second stage: 7m).
[Completion year] December 2022
[Project name] Misato Nagareyama Bridge Toll Road (tentative name) Misato Nagareyama Bridge superstructure (excluding A)
[Type of work] Production, transportation, erection, painting, floor slabs, accessories
[Steel weight] 1,631t
[Construction method] Crawler crane venting method, throwing method
[Completion year] December 2022
[Project name] Misato Nagareyama Bridge Toll Road (tentative name) Misato Nagareyama Bridge superstructure (excluding A)
[Type of work] Production, transportation, erection, painting, floor slabs, accessories
[Steel weight] 1,631t
[Construction method] Crawler crane venting method, throwing method
Tennobashi Bridge removal (Langer Department)
Miyagi
Tennobashi Bridge removal (Langer Department)
This project involved the removal of the Langer girders from the old Tenno Bridge on National Route 45, which spans the old Kitakami River in Ishinomaki, Miyagi Prefecture. More than 60 years have passed since the completion of the old Tenno Bridge, and due to deterioration over time and significant damage caused by the Great East Japan Earthquake, it was necessary to remove it in conjunction with a replacement project. The construction method involves lifting the girders using the installed erection girders, and then removing the cut girders with a crane on the erection girders. However, because the distance to the adjacent new bridge was about 3m, thorough safety measures were taken, such as measures to prevent the scattering of iron powder and the like, and temporary suspension of work when vehicles were passing, which made it possible to complete the removal without causing any accidents to third parties.
[Completion year] 2022
[Project name] Ishinomaki Kanomata area bridge removal project
[Type of work] Girder removal
[Construction method] Lifting and removal method using erection girders
[Completion year] 2022
[Project name] Ishinomaki Kanomata area bridge removal project
[Type of work] Girder removal
[Construction method] Lifting and removal method using erection girders
Tokyo Monorail No.6 Pillar Permanent Repair Work
Tokyo
Tokyo Monorail No.6 Pillar Permanent Repair Work
The Tokyo Monorail Haneda Airport Line opened in 1964, about one month before the Tokyo Olympics. Currently, the line carries an average of over 1 passengers per day, and is an important access line connecting central Tokyo with Haneda Airport. This project involved replacing the beams of the T-shaped steel columns of the Tokyo Monorail Haneda Airport Line. A fatigue crack was found at the corner of the beam during a regular inspection, and a temporary measure was implemented using a patch plate, but after further investigation, it was decided to replace the beams with new materials. Due to the harsh location conditions close to the railway, the project was highly challenging, as the column beams had to be replaced overnight with the monorail track girders temporarily supported. However, due to careful advance investigations using 1D simulations and test construction, the project was completed within the planned time.
[Year of completion] July 2022
[Project name] JR parallel section No.6 pillar permanent countermeasure project
[Type of work] Replacement of T-shaped steel columns and beams, replacement of supports, seismic reinforcement
[Steel weight] 13t
[Year of completion] July 2022
[Project name] JR parallel section No.6 pillar permanent countermeasure project
[Type of work] Replacement of T-shaped steel columns and beams, replacement of supports, seismic reinforcement
[Steel weight] 13t
2023Years
Hiroshima Football Stadium (EDION Peace Wing Hiroshima)
Hiroshima
Hiroshima Football Stadium (EDION Peace Wing Hiroshima)
This project is the construction of a new home stadium for J-League club Sanfrecce Hiroshima. We were responsible for the steel frame work, cable installation and tensioning work for the roof. By utilizing our special technology, we were able to create a column-free space over a total length of 130m. Opening in 2024, this property is a rare "Stadium in town" and has become a new symbol of Hiroshima.
[Client] Taisei Corporation
[Steel weight (t)] Roof steel: 3,845t
[Type of work] Vent
[Client] Taisei Corporation
[Steel weight (t)] Roof steel: 3,845t
[Type of work] Vent
Tsuruga Station
Fukui
Tsuruga Station
Construction work to build a new Hokuriku Shinkansen Tsuruga Station on the east side of JR Tsuruga Station. The platform will be a two-sided island type with four tracks, making it one of the largest Shinkansen station buildings in Japan. We carried out the overall steel construction work, including the erection of the passenger upper building steel frame, exterior base steel frame, ceiling base steel frame, mid-rise main building steel frame, evacuation staircase steel frame, east exit building steel frame, and ELV steel frame for each location, as well as high-strength bolt tightening, on the already constructed two-story RC rigid frame civil engineering structure.
[Client] Kajima Construction
[Steel weight (t)] 5,955t
[Type of Work] Railway construction, station buildings, pedestrian decks
[Client] Kajima Construction
[Steel weight (t)] 5,955t
[Type of Work] Railway construction, station buildings, pedestrian decks