1950
November 1957
Head office moved to Nishishibaura 2-chome, Minato-ku, Tokyo.
Saikai Bridge
Nagasaki
Saikai Bridge
This is a Nagasaki-Sasebo Line road bridge built over Inoura Seto in Omura Bay in northwestern Kyushu.It has a span of 216 meters, a width of 7.5 meters, a steel weight of 1927 tons, and was the third largest fixed arch bridge in the world at the time. It was the first long bridge in Japan. This bridge, which was completed 3 years after the war, overcame a wall with a span of 10 meters that had been impossible to cross before the war, and this period can be said to be the beginning of the era of the National Bridge.
1960
October 1961
Listed on the First Section of the Tokyo Stock Exchange
April
1963
1963
Separated the field construction department and established Yokogawa Construction Co., Ltd. in Chuo-ku, Tokyo.
October 1964
Opened Osaka branch and started operation of Osaka factory.
February 1969
Opened Tokyo branch and started operation of Chiba factory (closed March 1999)
Imperial Palace main gate iron bridge (Nijyubashi)
Tokyo
Imperial Palace main gate iron bridge (Nijyubashi)
The iron main gate iron bridge, which is located at the back of the Imperial Palace plaza, was constructed using the latest weather-resistant high-tensile materials at the time, with zinc metallicon instead of galvanizing for the surface treatment of the steel, and rivets instead of rivets for on-site joints. Adopts high strength bolts. It was an advanced model that had little experience in use in Japan at the time, and the opinions of Dr. Yutaka Tanaka of Yokogawa Bridge Works at the time were reflected in the entire bridge body, including the lower part. Since the girders were treated with zinc metallicon, the high-strength bolts were also treated with zinc metallicon. It was extremely pioneering at the time.
Meguro bridge
Tokyo
Meguro bridge
This bridge is Japan's first continuous PC box Girder bridge built cantilevered from precast concrete blocks. Without using any shoring in the center span, precast blocks made in advance at a yard were erected in a cantilevered manner, the joints were joined with adhesive, and prestressing was applied to construct the bridge girder. The construction work included the foundation, piers, and superstructure, and was large-scale, with a Bridge Length of 176.8 m and width of 16.5 m, concrete superstructure of 1,600 m1,121, piers of 1,433 mXNUMX, and foundation piles of XNUMX mXNUMX.
Tenmon Bridge (Amakusa No. 1 Bridge)
Kumamoto
Tenmon Bridge (Amakusa No. 1 Bridge)
The bridge was a 502-span underpass truss bridge with a length of 300m and a main span of 3m, making it one of the largest bridges of its type in the world at the time. For each side span of 100 m, vents were installed using vertical members and cross beams from the center span to a minimum, and the structure was constructed using a combination of vent construction and cantilever construction methods. The 300m central span extended 150m from each side span and was closed at the center. The bridge was completed through detailed planning and careful construction, including checking the shape of the truss each time each panel was assembled.
Hiroshima-ohashi Bridge
Hiroshima
Hiroshima-ohashi Bridge
This bridge is a steel deck box Girder bridge built over the sea in the inner part of Hiroshima Bay, with a length of 1,020 m and a width of 8.5 m4 (the upper and lower lines are separated). It consists of a total of 1 spans, including two girders and one simple box girder. Because it is difficult to install shoring at the bridge site, girder blocks (3 m, 2 tons), each with one span as an erection unit, were transported by barge to the site by sea, and then placed all at once on the bridge piers using a floating crane. A method of erection was adopted. This construction was Japan's first offshore large block construction method.
Kanmon Bridge
Yamaguchi Prefecture/Fukuoka Prefecture
Kanmon Bridge
The bridge is a 1,068-span, 712-hinged stiffened truss Suspension bridge with a length of 23 m, a center span length of 3 m, and a width of 2 m. It was built over the Kanmon Strait as part of the Kanmon Expressway, a national expressway connecting Honshu and Kyushu. It is one of Japan's most representative large-scale bridges (at the time of its construction, it was the longest Suspension bridge in the East), and in its Design, the safety of on-site construction for long Suspension bridges was fully considered, and Design methods such as earthquake and wind resistance were established and applied. A prefabricated strand method, which is new in the world, was used to erect the cables, and Japan's first sequential stiffening method was used to erect the stiffening trusses.
Minato-ohashi Bridge
Osaka
Minato-ohashi Bridge
The Port Bridge is a 980-span Gelbert truss bridge with a length of 22.5 m, a main structure spacing of 4 m, and a double-deck structure with 8 lanes of roadway (3 lanes total on the upper and lower sides). With a center span length of 510m, it is the third largest truss bridge in the world. During construction, the latest technology at the time was utilized in all areas of materials, Design, fabrication, and erection, including the use of thick high-strength steel HT3 and HT80. In particular, the central span was 70m long and the steel weight was 186t, which was lifted all at once using a winch, and was the forerunner of today's large block construction.
Omega transmitting station aerial tower
Nagasaki
Omega transmitting station aerial tower
It was a 455m tall steel tower built in Kamitsuma-cho, Tsushima City, Nagasaki Prefecture as one of the transmitting stations for Omega navigation, and was called "the largest steel tower in the East" at the time. During construction, we newly developed a 1,000tm tripod derrick for unloading cargo, a 455t self-climbing erector to lift steel pipes to a height of 20m, and an endless winding winch for a cable crane with a span of 1,000m. This steel tower was used for approximately 25 years and was dismantled in 1998, but our company also handled the inspection and dismantling during its service life.
Suigo-ohashi Bridge
Chiba prefecture/Ibaraki prefecture
Suigo-ohashi Bridge
The bridge, which was built to connect Chiba and Ibaraki across the Tone River, was the largest two-span continuous cable-stayed bridge in Japan. The cable used for the upper tier was 2 x PWS19, and its outer diameter was 169 mm, making it one of the largest cables for cable-stayed bridges in Japan. For construction, we adopted a cantilever construction method that utilizes the cable-stayed bridge's towers and cables, and also uses vents, which requires less temporary equipment. The largest number of blocks allowed to pass through the locks on the Tone River were transported by water, assembled into large blocks on a large barge floated near the erection point, and erected.
Omishima Bridge
Ehime
Omishima Bridge
The Omishima Bridge, which was built as the first Honshu-Shikoku connecting bridge, is a single-span, solid rib, two-hinged arch bridge with a span of 1 m, connecting Omishima Island and Hakata Island. The construction was carried out using cable cranes with a capacity of 295 tons and 2 tons, and a construction method was adopted in which the arch ribs were hung diagonally from multiple points and assembled in a cantilevered manner. After that, the side ties are fixed to the arch abutments to increase the rigidity of the arch, the floor assemblies and steel lattice slabs of the side ties are erected, and the center tie, its floor assemblies, and steel lattice slabs are erected one panel at a time toward the center. Closed.
Monzengawa Bridge
Yamaguchi
Monzengawa Bridge
This project involved replacing nine dilapidated rice girders with a span of 19.2 meters spanning the Monzen River between Iwakuni and Minami-Iwakuni on the San'in Main Line with a three-span truss bridge. This is a special double-track bed type truss that eliminates vertical girders to reduce the dimension from the rail surface to the lowest end of the girder, and also arranges cross girders between the points.The main structure spacing is 9 m, the span is 3 m, and there are 9 consecutive bridges. It is 612m long and has a steel weight of 3t.
Tokaido-honsen Fujigawa Bridge
Shizuoka Prefecture
Tokaido-honsen Fujigawa Bridge
In the early morning hours of August 1982, 2, Typhoon No. 10 caused the largest flooding of the Fuji River in recorded history, causing the No. 4 bridge pier on the Tokaido Main Line Fuji River Bridge down line to collapse and two truss bridges to fall and be washed away. In order to quickly reopen the aorta to double track, it was decided that the pier would be restored at the same location as the pier that had collapsed. The superstructure was constructed by installing temporary linkages on the existing truss bridges on both sides, and simultaneously constructing it from both sides using a cantilever construction method using a traveler crane. Although there were some difficulties during construction, such as being hit by a typhoon, the bridge was restored and opened to double-track traffic within 2 days of being washed away.
New Kokugikan Sumo Arena
Tokyo
New Kokugikan Sumo Arena
The structure of the large roof of the New Kokugikan consisted of a main component consisting of eight beams and a truss to carry the roof load, and was made of 8 1,725 steel high-strength bolts. The construction method is a combination of winch lift-up method and truck crane method. By making full use of our equipment and carrying out a lifting test at Yokogawa Bridge Manufacturing Co., Ltd.'s Chiba factory before starting construction, we succeeded in assembling this revolutionary special structure with high precision. A dedication ceremony was held on January 5, and the new Kokugikan opened with great fanfare.
Seiun Bridge (Shinhinokage Bridge)
Miyazaki
Seiun Bridge (Shinhinokage Bridge)
Seiunkyo Bridge is located in Hinokage-cho, Miyazaki Prefecture, and is a spandrel braced arch bridge spanning the Gokase River on National Route 218 (Takachiho-Nobeoka), with a length of 410m, a width of 12.5m, and a height of 140m from the water surface. Erection was carried out using a cable crane (span 360m) using the cantilever construction method. Due to strong winds, the operating rate was extremely low during the winter period from December to the following March. Furthermore, although the northern part of Miyazaki Prefecture is one of the rainiest regions in Japan and is always at risk of falling, the construction work, which took two years and five months, was completed without any accidents.
Onaruto Bridge
Tokushima
Onaruto Bridge
The bridge is a 876-span, 1,629-hinged stiffened truss Suspension bridge with a center span of 3 m and a Bridge Length of 2 m, spanning the Naruto Strait, which is famous for its whirlpools.The upper surface of the truss is for road use, and the lower surface is for railway use. . Taking natural conditions into consideration when constructing the cable, we adopted a free-hanging method in which the pilot rope was pulled out directly by a tugboat to cross the sea. For the erection of the stiffening truss using prefabricated strands (PWS) for the main body cable, the face material was erected using a 90 lifting traveler crane Designed and manufactured for this construction.
1980
October 1988
Established Yokogawa Mentech Co., Ltd. through joint investment with Yokogawa Construction Co., Ltd.
Iwakurojima Bridge
Kagawa
Iwakurojima Bridge
The bridge is a three-span continuous cable-stayed bridge that connects Iwakuro Island and Hasa Island, with a center span of 420 m, a Bridge Length of 790 m, and a main tower height of 157 m above sea level. Our company was in charge of the construction on the Iwakuro Island side. The lower part of the tower and the intermediate vent were erected using a crane ship, and on top of that, a large side span truss block for 3 panels near the tower was assembled on the ground and suspended using two 10-ton floating cranes. After the upper part of the tower and the remaining side span truss were erected using a traveler crane, the center span truss was erected in a cantilevered manner using a traveler crane, a diagonal suspension cable was stretched, and it was closed at the center of the center span.
Yoshima Bridge
Kagawa
Yoshima Bridge
This bridge is located almost in the center of the Kojima-Sakaide Route of the Honshu-Shikoku Connecting Bridge, and is one of the world's leading three-span continuous truss bridges with a center span of 245m and a Bridge Length of 588.3m. In addition, the truss structure is complicated because the main bridge handles the intersection of the cable-stayed Suspension bridges on the Honshu side and the North-South Bisan Seto Bridge on the Shikoku side. Erection was carried out in one go using a 3-ton floating crane with a diagonal bent at the intermediate fulcrum, and then a single member was cantilevered using a traveler crane while maintaining the balance between the side and main spans.
Shimotsui Seto-ohashi Bridge
Okayama
Shimotsui Seto-ohashi Bridge
It is a single-span road/railway Suspension bridge with a length of 1,447m that spans the strait closest to Honshu on the Kojima-Sakaide route of the Honshu-Shikoku Connecting Bridge. For the cable installation, we adopted the air spinning (AS) method, which allows for a smaller anchoring space due to limitations in anchoring work, and due to site constraints, all wire ropes were pulled out from the Hakuishijima side. In the AS construction method, the spinning wheel that loops the wire and transports it to the opposite bank is replaced with four pulleys, twice the number of conventional wheels, dramatically improving overhead wire efficiency.
Minamibisan Seto-ohashi Bridge
Kagawa
Minamibisan Seto-ohashi Bridge
This bridge is a 1,100-span continuous road/railway Suspension bridge with a central span of 1,648 m and a Bridge Length of 3 m, located closest to Shikoku in the Kojima-Sakaide route of the Honshu-Shikoku Connecting Bridge.The northern anchorage is the Kita-Bisan Seto Bridge. This is a unique structure in the world as it is shared with the public. Our company was in charge of constructing the cables and stiffening girders, using PWS for the cables, and constructing the stiffening trusses using the large block construction method using a 4-ton floating crane for the four panels of the tower section, and using a traveler crane for the rest. The face material was erected using the non-hinge sequential stiffening method.
1990
October 1991
Changed company name from Yokogawa Bridge Manufacturing Co., Ltd. to Yokogawa Bridge Co., Ltd.
Makuhari Messe Exhibition Hall
Chiba
Makuhari Messe Exhibition Hall
Makuhari Messe Exhibition Hall is a large exhibition hall measuring 108m wide and 516m long, and our company was in charge of the roof steel construction. Since it has a large space structure with a long span between columns of 60m, large block ground assembly and bulk erection are basically used. The keel truss, which will serve as the main framework, was made into a large block using ground assemblies, and suspended by two 300-ton crawler cranes. As the construction period was extremely short, the construction was carried out on a tight daily schedule.
Yokohama Bay Bridge
Kanagawa
Yokohama Bay Bridge
The bridge is a cable-stayed bridge with a center span of 460 m that was built at the point where the Yokohama shipping route crosses from Honmoku Pier to Daikoku Pier. In order to avoid navigational restrictions as much as possible during the construction work, the side span was erected using a large crane ship, with a pent erected in a position that would not obstruct small vessels, and the side span was divided into two blocks. After fully confirming the safety of the central span through seismic analysis and wind tunnel testing, we adopted a cantilever construction method that takes advantage of the mechanical properties of cable-stayed bridges and gradually extends the main girder while tensioning the cables.
Tokyo Metropolitan Government Building 2nd Main Building
Tokyo
Tokyo Metropolitan Government Building 2nd Main Building
The construction of the second Tokyo Metropolitan Government Building is the first project in which our company has participated in full-scale construction of a skyscraper. For construction, we adopted the girder unit construction method and used two JCC900H and two JCC2H tower cranes to construct the steel frame. There were many challenges such as construction planning, labor management, process management, and quality control, but the fact that we cleared them all and completed the construction safely led to our company's subsequent expansion into high-rise building construction. .
Wakato-ohashi Bridge
Fukuoka
Wakato-ohashi Bridge
Wakato Bridge is a famous bridge that was hailed in 1962 as ``the most dream Suspension bridge in the East.'' This work involves widening the road from two lanes on the concrete deck at the time of construction to four lanes on the steel deck, without requiring any traffic closures. At the site, 2) ensuring two lanes at all times during construction; 4) installing steel deck slabs that take into account the heat of the goose asphalt pavement; 1) controlling shape during construction; 2) installing construction equipment that takes safety into account for general traffic. There were a number of planning and other challenges, but all of them were cleared and the construction was successfully completed.
Semimaru Bridge
Kyoto
Semimaru Bridge
Semimaru Bridge is a steel two-hinge arch bridge, and due to severe damage to the concrete slab, it was decided that improvements to the upper and lower tracks, including preparatory work, would be carried out over a three-year period. Reinforcement work was carried out in an extremely short period of time, from 2:3 PM to 13:20 AM the following day over 6 days. In particular, on the first day, we removed the expansion device, removed the deck slab, removed the vertical members, removed the bearings, then drilled holes for new bearings, installed the bearings, erected the vertical members and diagonal members, erected the steel deck slab, paved, Lines were drawn and a temporary expansion device was erected, and once the floor slabs were removed, there was no going back, so it was stressful. The construction work was completed successfully, and the effects of the reinforcement work are still continuing.
Izumo Mokumoku Dome
Shimane
Izumo Mokumoku Dome
This dome has a framework structure similar to a Janome umbrella, and its main frame is made of wood (laminated wood). The main frame was assembled close to the ground, and by pushing up the middle and sliding the surroundings toward the center, we created a dome with an umbrella-like structure. To prevent the shape of the umbrella from bulging out, the legs were secured using ring-shaped tie rods on the inside, and the central support vent was jacked down and opened to construct the dome.
Hanshin Racecourse
Hyogo
Hanshin Racecourse
This work involves the construction of a structure that will cover the adjacent paddock area with a large roof in conjunction with the renovation of the Hanshin Racecourse Plaza Building. The structure is characterized by a large roof structure consisting of a main truss, sub-truss, and truss connecting beams, with the main structure being a pipe truss structure.It is equipped with a top light system for daylighting, and the bird's-eye view gives a bird's-eye view that resembles a bird spreading its wings. It is characterized by ``like-like''. The construction method used was a large crane using bent support. For this project, the customer requested super-rush construction, so one 750 lifting crawler crane was placed in the center of the paddock, and two 1 lifting crawler cranes were placed on the outer periphery, and approximately 650 tons were completed in three months.
LaLaport Ski Dome SSAWS
Chiba
LaLaport Ski Dome SSAWS
The roof steel frame is nearly 100 meters above the ground, and since a crane or vent from the ground would be large, the crane + gantry, pent + gantry, or scaffolding + gantry were slid diagonally on the slope of the slope steel frame to create mobile equipment. Equipment was reduced. Since the overall area is large, each piece of equipment was basically made movable and reusable. Ten years later, in 10, SSAWS completed its role and was to be dismantled, and our company also carried out the demolition work.
Shin Umeda City Hanging Garden
Osaka
Shin Umeda City Hanging Garden
Shin Umeda City had a very innovative structure at the time, connecting 40-story east-west skyscrapers with a hanging garden at the top, and our company was involved in the lift-up construction of the hanging garden. The construction work was large-scale, with a lifting weight of 1,040 meters and a lifting height of 147 meters. At that time, there were no hydraulic jacks in Japan that could lift at high speeds, so an endless winch, which had been used in construction of port bridges, was used. The lifting of the Hanging Garden began at 1992 a.m. on May 18, 6, and it reached its anchorage approximately 13 hours later, at around 19 p.m. on the same day.
Fukuoka Dome
Fukuoka Dome
Fukuoka Dome is Japan's first stadium with a large-scale retractable roof structure. The roof steel frame was made into large blocks, and faces were assembled in an adjacent yard, and blocks were assembled inside the arena to ensure assembly accuracy and improve workability and safety of erection. For the entire roof, vent equipment was installed at 18 locations, and the outer circumferential section was constructed by assembling one-third of the outer circumference of the fixed roof at the bottom, and then stacking the middle and upper layers. Next, the three layers of the central section were assembled, and finally the central section (ball core section) was assembled to complete the erection.
1995
Participating in reconstruction efforts following the Great Hanshin-Awaji Earthquake
May
1997
1997
ISO9001 certification registration
MM21 Landmark Tower
Kanagawa
MM21 Landmark Tower
With the aim of shortening the process and responding to the need for larger steel components, units, and blocks, four JCC1500H tower cranes, the largest in Japan, were used for erection. For large blocks, the pillars and beams were integrated (maximum 4t) for erection, and the girder units were installed with underfloor equipment piping to reduce the number of lifts. SM65Q was used for the extremely thick columns (80-90mm), which required strict management.
Rainbow Bridge (Tokyo Port Bridge)
Tokyo
Rainbow Bridge (Tokyo Port Bridge)
The main bridge is a 798m long Suspension bridge that connects Shibaura and Daiba in Minato Ward, Tokyo, and is commonly referred to as the Rainbow Bridge. During construction, pilot ropes were carried across the sea by towboat from the Shibaura side, and catwalk flooring was sent out from both main towers one after another and erected. To construct the strands, the strands were sequentially placed on pull-out rollers on the catwalk from the Shibaura side using a strand carrier attached to a holing rope, and sent to the anchorage on the Daiba side, where they were fixed at a predetermined position on the anchor frame.
Hiogawa Bridge
Osaka
Hiogawa Bridge
The Meishin Expressway was Japan's first expressway, opening between Ritto and Amagasaki in 1973. Since then, it has contributed to economic development as a major artery of land transportation, but bridges and other structures have deteriorated due to increased traffic volume and larger vehicles. The same thing happened at the Hiogawa Bridge located between Kyoto Minami IC and Ibaraki IC, so we carried out complete replacement work for the damaged RC deck and drastic main girder reinforcement work to accommodate larger vehicles. We went at the same time.
Toyota-ohashi Bridge
Aichi
Toyota-ohashi Bridge
The main bridge was constructed as part of Toyota City's 50th anniversary project, and was Designed by architect Kisho Kurokawa, along with Toyota Stadium. The arch ribs, inspired by ribs, have a unique shape, and their cross-sectional shape changes from a square to a hexagon from the base to the arch crown, and the base has a double structure of an outer arch and an inner arch. Furthermore, the hanging materials are arranged radially from the arch ribs, and a decorative board is attached to the arch lip, and the left and right arches are tied to the decorative board in the shape of a passport handle.
Eto-ohashi Bridge (Hayahito Bridge)
Miyazaki
Eto-ohashi Bridge (Hayahito Bridge)
National Route 218 is a mountain road that starts in Kumamoto and goes to Nobeoka City via Takachiho Town, Miyazaki Prefecture. Hayato Bridge is a steel braced rib fixed arch bridge located in Kitagata-cho, Miyazaki Prefecture.The most distinctive feature is that it is a fixed arch bridge in the completed version, but it was constructed as a two-hinge arch bridge in the constructed version. Along this route, our company has built Unkai Bridge, Seiun Bridge, and Makibee Bridge, all of which are among the largest in Japan. The main bridge with an arch span of 2m was successfully closed on March 275, and the Indian red arch bridge reflected beautifully on the surface of the Gokase River.
Seikenji Bridge
Shizuoka Prefecture
Seikenji Bridge
The Tomei Expressway Seikenji Bridge is a three-span continuous Gelber Bridge built in 1968 in Shimizu City, Shizuoka Prefecture, spanning the Tokaido Shinkansen. In 3, the bridge was reinforced by reinforcing the longitudinal girders and gluing steel plates, but after that it was necessary to cope with even larger earthquakes and to accommodate larger vehicles. The reinforcement work involves remodeling the Gelber girder hinge to a continuous girder by eliminating the Gelber girder hinge.Continuing the Gelber girder hinge is not just a simple attachment of the current cross section, but a full-scale project that involves replacing the main girder at the attached section, including the floor slab. We made some structural changes.
1999
Opening of Tatara Bridge and Kurushima-kaikyo No.3 Bridge
Completion of all three Honshi-Shikoku routes
Completion of all three Honshi-Shikoku routes
Ogatayama Overpass Bridge
Yamanashi Prefecture
Ogatayama Overpass Bridge
The Ogata Yamanashi Road Bridge is a Nielsen-Rose type bridge with the longest span among the linear experimental lines. As the building will be built on an expressway, a swing construction method was adopted to ensure safety during construction and to shorten the period of disruption to road traffic. The Nielsen type was the first of its kind for a railway bridge, and the swing erection weight of over 1,500 tons was the largest swing erection method ever used.
Hakucho-ohashi Bridge
Hokkaido
Hakucho-ohashi Bridge
This bridge is a 720-span, 1,380-hinged stiffened Suspension bridge with a center span of 3 m and a Bridge Length of 2 m, located at the mouth of the Muroran Port as the main bridge of the Shiratori Shindo. Our company carried out the main tower and stiffening girder work. When constructing the stiffening girder, a stiffening girder block (approximately 220 tons) is hoisted to a predetermined height by a lifting beam from a transport barge held at a fixed point on the sea, and then fixed to a hanger rope suspended from a cable. By repeating this process, the girder blocks were connected and each span was closed, completing the erection of the stiffening girder.
Osaka Dome
Osaka
Osaka Dome
To construct the roof of the Osaka Dome, the central 166.5m diameter portion of the 134m diameter dome roof was assembled on the ground, and the outer 32.5m portion was supported by a vent at a predetermined height. Afterwards, 18 hydraulic strand jacks were used to lift up the central part (5,500t*49m) to construct the roof structure.
Cup Suimon Bridge (Kumuimon Bridge)
Hong Kong
Cup Suimon Bridge (Kumuimon Bridge)
The bridge is a two-tier composite cable-stayed bridge that connects Lantau Island, where Hong Kong's new airport was built, and Mawan Island on the Kowloon side. The central span is a composite box girder structure made of steel and concrete, and the main tower is also a concrete structure. The RC structure main tower was constructed using the jump form method, and the PC box girders in the side spans were constructed using the extrusion method. Regarding the erection of the central span, steel girders were assembled on the ground in a reclaimed yard in the construction area of the site, and the upper and lower deck slabs were cast to create a box girder structure, and the segments were erected directly below.
Akashi Kaikyo-ohashi Bridge
Hyogo
Akashi Kaikyo-ohashi Bridge
The Akashi Kaikyo Bridge, which connects Kobe City's Tarumi Ward and the northern tip of Awaji Island with a total length of 3911m and a central span of 1,991m, is the world's largest Suspension bridge, with its two main towers reaching approximately 2m above sea level. The cable was constructed using the prefabricated parallel wire strand construction method (PWS construction method), in which 300 high-strength galvanized steel wires (strands) with a diameter of 523 mm are bundled into a hexagonal shape at the factory and then erected as one construction unit. To erect the stiffening girder, large blocks were erected using a floating crane at the main tower and abutment sections, and then face plates were erected at the truss section using a traveler crane.
Seibu Dome
Saitama
Seibu Dome
This construction project aims to transform the baseball field into a dome during the second off-season period for professional baseball. The lower roof of the first phase was constructed using a circumferential effect, and was supported by vents. The central roof in the second stage was constructed using a 2-point lift-up method. Because the construction was short-term, the work involved two shifts, day and night, with no days off, but the work proved our company's high level of technical prowess.