Promoting social infrastructure development with the ability to make reliable technical proposals.

Bridge construction requires comprehensive technical proposal capabilities that can optimize the entire process of Design, fabrication, and erection.
Known as "Yokogawa of Technology," we make full use of our advanced technical and management capabilities.
We have earned the trust of many customers by accurately responding to their requests.

Solutions
01
Design technology
Our company has been handling steel structures of various sizes, including long bridges, for many years.
We have been working to improve efficiency and sophistication by visualizing the structure using 3D models from an early stage, while creating highly accurate Designs that are easy to maintain and manage.
Utilization of BIM/CIM
02
Construction technology
We achieve safe and high-quality construction by acquiring construction performance evaluation points on-site and optimizing construction conditions and processes.
In particular, by utilizing our proprietary construction information system and special construction equipment, we are able to safely handle even advanced construction work.
Hand-rolling mill rotation dismantling method
03
Environmental technology
We are working to reduce CO2 emissions generated during the steel bridge manufacturing process, reducing the amount of steel used, and reviewing welding methods.
Through the latest ICT technology and improvement activities, we are creating more sustainable bridges while minimizing the impact on the environment.
Large automatic cutting machine (frame planer) that uses hydrogen gas
Production system

The Osaka factory is located in the Sakai-Senboku waterfront industrial zone, and is equipped with the latest equipment and is responsible for the production of various large steel structures.
We use the latest technology to create long Honshu-Shikoku bridges such as the Seto Bridge, Akashi Kaikyo Bridge, Kurushima Kaikyo Bridge, and Tatara Bridge, the airport link bridge at Kansai International Airport, access-related bridges, and terminal buildings. We maintain our position as a leading steel structure production factory.

In addition, there is a pier at the southern end of the factory site where a large floating crane can dock, and products can be assembled into large blocks on the pier and taken out to shore.

Establishment1964 October
AddressSakai City, Osaka Prefecture
site125,413㎡
House34,848㎡
Production Capacity5,000 tons per month
Full view of the factory
Inside the factory
Construction Results
New bridge project | Girder bridge
Awa Shirasagi-ohashi Bridge
New bridge construction | Cable-stayed bridge
Ikina Bridge
New bridge project | Girder bridge
Tomoe River side road bridge